Hi!
Have a issue with vDP 5.8 with vCSA 5.5U2b.
After both of these VMs are restarted (ie the ESXi's) all created jobs and backup are lost.
Rebooting either of the VM's the data and or schedules are still OK, keeping the ESXi up.
Recreating jobs works fine, backups then work fine, restoring works fine.
But, a reboot of both VMs (ie a power outage of the ESXi's) erases the vDP.
SSH:ing info the vDP shows all disks are at 1% usage which confirms the UI's response.
Any suggestions?
//Chris